Assessment Year | 1992 |
---|---|
Principal Product | EARTH MOVERS ATTACHMENTS |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 2,500
ton
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,309 | 2,644,490 |
kWh
|
$0.054 |
Natural Gas | $30,146 | 9,774 |
MMBtu
|
$3.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,702 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,733 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $13,442 | - |
$2,938
54,220
kWh
|
$4,069
-
MMBtu
|
$6,435 | |
02 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $6,266 | $31,766 |
$(-492.0)
(-9,086)
kWh
|
$6,758
-
MMBtu
|
- | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,768 | $887 |
$524
9,672
kWh
|
$1,244
-
MMBtu
|
- | |
04 | 2.6232: Install set-back timers | $873 | $870 |
$873
16,120
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,302 | $540 |
$1,302
24,033
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $400 | $900 | - |
$400
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $397 | $250 |
$397
7,327
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $254 | $160 |
$254
4,689
kWh
|
- | - | |
TOTAL RECOMMENDED | $24,702 | $35,373 |
$5,796
106,975
kWh
|
$12,471
-
MMBtu
|
$6,435 | ||
TOTAL IMPLEMENTED | $9,733 | $33,443 |
$1,731
31,946
kWh
|
$8,002
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs