ITAC Assessment: KU0365
ITAC logo
ITAC Assessment: KU0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product EARTH MOVERS ATTACHMENTS
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 2,500
ton
Production Hrs. Annual 4,940
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,309 2,644,490
kWh
Natural Gas $30,146 9,774
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,702 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2532: Use only amount of air necessary to prevent explosion hazard $13,442 - $2,938
54,220
kWh
$4,069
-
MMBtu
$6,435
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $6,266 $31,766 $(-492.0)
(-9,086)
kWh
$6,758
-
MMBtu
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,768 $887 $524
9,672
kWh
$1,244
-
MMBtu
-
04 2.6232: Install set-back timers $873 $870 $873
16,120
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,302 $540 $1,302
24,033
kWh
- -
06 2.2437: Recover waste heat from equipment $400 $900 - $400
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $397 $250 $397
7,327
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $254 $160 $254
4,689
kWh
- -
TOTAL RECOMMENDED $24,702 $35,373 $5,796
106,975
kWh
$12,471
-
MMBtu
$6,435
TOTAL IMPLEMENTED $9,733 $33,443 $1,731
31,946
kWh
$8,002
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs