ITAC Assessment: KU0363
ITAC logo
ITAC Assessment: KU0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AGRICULTURE EQUIPMENT
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area
n/a
Annual Production 7,561
pieces
Production Hrs. Annual 2,142
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,555 640,680
kWh
Natural Gas $49,362 11,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,217

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $14,829 - - $16,829
-
MMBtu
$(-2,000.0)
02 2.5194: Redesign process $1,590 $2,500 - $1,590
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,576 - $2,244
36,342
kWh
$(-668.0)
-
MMBtu
-
04 2.7442: Keep doors and windows shut when not on use $207 - - $207
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $290 $850 $290
4,689
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $181 $200 $181
2,931
kWh
- -
TOTAL RECOMMENDED $18,673 $3,550 $2,715
43,962
kWh
$17,958
-
MMBtu
$(-2,000.0)
TOTAL IMPLEMENTED $15,217 $200 $181
2,931
kWh
$17,036
-
MMBtu
$(-2,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs