ITAC Assessment: KU0349
ITAC logo
ITAC Assessment: KU0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BREADS, PASTRIES, DOUGHS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 15,800,000
pieces
Production Hrs. Annual 7,176
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,820 2,781,067
kWh
Natural Gas $54,690 21,396
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2522: Isolate hot or cold equipment $4,092 $5,200 $3,048
76,495
kWh
$1,044
-
MMBtu
-
02 2.2621: Modify refrigeration system to operate at a lower pressure $1,460 $2,800 $1,460
36,635
kWh
- -
03 2.6232: Install set-back timers $1,110 $200 $1,110
27,843
kWh
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $934 $1,500 $934
23,447
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $677 $850 $677
16,999
kWh
- -
06 2.2212: Use minimum safe oven ventilation $1,377 - - $1,377
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $413 - - $1,213
-
MMBtu
$(-800.0)
08 2.3212: Optimize plant power factor $1,702 $3,024 $1,702
-
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $829 $410 $829
20,809
kWh
- -
10 2.4221: Install compressor air intakes in coolest locations $222 $380 $222
5,569
kWh
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $128 - $128
3,224
kWh
- -
TOTAL RECOMMENDED $12,944 $14,364 $10,110
211,021
kWh
$3,634
-
MMBtu
$(-800.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs