ITAC Assessment: KU0342
ITAC logo
ITAC Assessment: KU0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CENTRIFUGAL PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,190
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,587 4,654,748
kWh
Natural Gas $45,353 15,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $12,017 $3,600 $12,017
213,072
kWh
-
02 2.7261: Install timers and/or thermostats $8,091 $9,690 - $8,091
-
MMBtu
03 2.7261: Install timers and/or thermostats $774 $1,140 $264
4,689
kWh
$510
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,753 $500 $7,753
137,456
kWh
-
05 2.3512: De-energize excess transformer capacity $4,942 $100,000 $4,942
87,632
kWh
-
06 2.6232: Install set-back timers $2,678 $550 $2,678
47,479
kWh
-
07 2.7314: Reduce ventilation air $1,195 $200 $397
7,034
kWh
$798
-
MMBtu
08 2.7221: Lower temperature during the winter season and vice-versa $325 - - $325
-
MMBtu
TOTAL RECOMMENDED $37,775 $115,680 $28,051
497,362
kWh
$9,724
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs