ITAC Assessment: DL0179
ITAC logo
ITAC Assessment: DL0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic Buckets or Pails
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,019,900 17,658,961
kWh
Electricity Demand $165,613 35,507
kW-mo/yr
Electricity Fees $7,391 -
Other Gas $65,217 2,000
MMBtu
TOTAL YEARLY COSTS $1,258,121
RECOMMENDED SAVINGS* $150,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $8,390 $2,500 $8,390
125,000
kWh
-
02 2.4224: Upgrade controls on compressors $7,410 $6,500 $7,410
111,000
kWh
-
03 2.7261: Install timers and/or thermostats $5,600 $600 $5,600
83,550
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,200 $17,000 $16,200
242,000
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,580 $15,000 $3,580
53,470
kWh
-
06 2.2437: Recover waste heat from equipment $26,500 $11,625 - $26,500
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $17,250 $13,450 $17,250
257,415
kWh
-
08 2.2692: Use outside cold water source as a supply of cooling water $65,500 $47,500 $65,500
977,000
kWh
-
TOTAL RECOMMENDED $150,430 $114,175 $123,930
1,849,435
kWh
$26,500
-
MMBtu
TOTAL IMPLEMENTED $61,320 $43,175 $34,820
519,435
kWh
$26,500
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs