ITAC Assessment: KU0341
ITAC logo
ITAC Assessment: KU0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product METAL BUILDINGS
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 30,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,903 3,147,421
kWh
Natural Gas $42,194 9,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,057 $600 - $2,057
-
MMBtu
02 2.2532: Use only amount of air necessary to prevent explosion hazard $3,592 $400 $744
15,826
kWh
$2,848
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $3,117 $950 $565
12,016
kWh
$2,552
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $5,453 $9,300 $5,453
116,061
kWh
-
05 2.7441: Replace broken windows and/or window sash $1,435 $800 - $1,435
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,048 $570 $4,048
86,166
kWh
-
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,561 $1,975 $2,561
54,513
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $1,102 $800 $1,102
23,447
kWh
-
TOTAL RECOMMENDED $23,365 $15,395 $14,473
308,029
kWh
$8,892
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs