Assessment Year | 1991 |
---|---|
Principal Product | METAL BUILDINGS |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,903 | 3,147,421 |
kWh
|
$0.047 |
Natural Gas | $42,194 | 9,521 |
MMBtu
|
$4.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $2,057 | $600 | - |
$2,057
-
MMBtu
|
|
02 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $3,592 | $400 |
$744
15,826
kWh
|
$2,848
-
MMBtu
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $3,117 | $950 |
$565
12,016
kWh
|
$2,552
-
MMBtu
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $5,453 | $9,300 |
$5,453
116,061
kWh
|
- | |
05 | 2.7441: Replace broken windows and/or window sash | $1,435 | $800 | - |
$1,435
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,048 | $570 |
$4,048
86,166
kWh
|
- | |
07 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,561 | $1,975 |
$2,561
54,513
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,102 | $800 |
$1,102
23,447
kWh
|
- | |
TOTAL RECOMMENDED | $23,365 | $15,395 |
$14,473
308,029
kWh
|
$8,892
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs