ITAC Assessment: KU0335
ITAC logo
ITAC Assessment: KU0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COOKWARE & WATER FILTERS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,788
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,227 1,679,074
kWh
Natural Gas $6,608 1,457
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,927

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,716 - $9,608
145,076
kWh
$(-2,892.0)
-
MMBtu
-
02 2.2532: Use only amount of air necessary to prevent explosion hazard $6,430 - $3,416
51,583
kWh
$2,384
-
MMBtu
$630
03 2.6212: Turn off equipment during breaks, reduce operating time $4,755 $1,500 $4,755
71,805
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,018 - $2,633
-
kWh
$(-615.0)
-
MMBtu
-
05 2.6232: Install set-back timers $641 $300 $641
9,672
kWh
- -
06 2.7221: Lower temperature during the winter season and vice-versa $590 - $427
6,448
kWh
$163
-
MMBtu
-
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $369 $300 $369
5,569
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $408 $388 $408
6,155
kWh
- -
TOTAL RECOMMENDED $21,927 $2,488 $22,257
296,308
kWh
$(-960.0)
-
MMBtu
$630
TOTAL IMPLEMENTED $21,927 $2,488 $22,257
296,308
kWh
$(-960.0)
-
MMBtu
$630
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs