| Assessment Year | 1993 |
|---|---|
| Principal Product | napkins,towels and wrapp |
| NAICS |
n/a
|
| SIC | 2676: Sanitary Paper Products |
| Sales Range | $10 M to 50M |
| # of Employees | 42 |
| Plant Area |
50,000
ft2
|
| Annual Production | 22,659
ton
|
| Production Hrs. Annual | 7,344
hrs
|
| Location (State) | Vermont |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $716,176 | 9,919,109 |
kWh
|
$0.072 |
| Fuel Oil #6 | $252,640 | 125,238 |
MMBtu
|
$2.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $373,896 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,600 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $334,726 | $400,000 |
$716,176
9,919,109
kWh
|
$(-432,598.0)
-
MMBtu
|
$51,148
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,949 | $29,400 |
$16,949
234,760
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $14,570 | $45,308 |
$(-6,517.0)
(-90,270)
kWh
|
- |
$21,087
-
MMBtu
|
|
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,205 | - |
$5,205
72,098
kWh
|
- | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $1,406 | $1,408 | - | - |
$1,406
-
MMBtu
|
|
| 06 | 2.2122: Install / repair insulation on condensate lines | $1,040 | $4,230 | - | - |
$1,040
-
MMBtu
|
|
| TOTAL RECOMMENDED | $373,896 | $480,346 |
$731,813
10,135,697
kWh
|
$(-432,598.0)
-
MMBtu
|
$74,681
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,600 | $35,038 |
$22,154
306,858
kWh
|
- |
$2,446
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs