ITAC Assessment: MA0287
ITAC logo
ITAC Assessment: MA0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product napkins,towels and wrapp
NAICS
n/a
SIC 2676: Sanitary Paper Products
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 50,000
ft2
Annual Production 22,659
ton
Production Hrs. Annual 7,344
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $716,176 9,919,109
kWh
Fuel Oil #6 $252,640 125,238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $373,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #6 Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $334,726 $400,000 $716,176
9,919,109
kWh
$(-432,598.0)
-
MMBtu
$51,148
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,949 $29,400 $16,949
234,760
kWh
- -
03 2.2437: Recover waste heat from equipment $14,570 $45,308 $(-6,517.0)
(-90,270)
kWh
- $21,087
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,205 - $5,205
72,098
kWh
- -
05 2.2136: Install / repair insulation on steam lines $1,406 $1,408 - - $1,406
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $1,040 $4,230 - - $1,040
-
MMBtu
TOTAL RECOMMENDED $373,896 $480,346 $731,813
10,135,697
kWh
$(-432,598.0)
-
MMBtu
$74,681
-
MMBtu
TOTAL IMPLEMENTED $24,600 $35,038 $22,154
306,858
kWh
- $2,446
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs