ITAC Assessment: IP0092
ITAC logo
ITAC Assessment: IP0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Powertrain Components
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 244
Plant Area 188,932
ft2
Annual Production 12,512,350
units
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,042,761 34,657,649
kWh
Electricity Demand $1,551,153 61,328
kW-mo/yr
Electricity Fees $18,619 -
Natural Gas $40,330 6,063
MMBtu
TOTAL YEARLY COSTS $2,652,863
RECOMMENDED SAVINGS* $132,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $132,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4323: Use optimum size and capacity equipment $1,211 - $562
18,720
kWh
$649
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $876 - $876
29,212
kWh
- - -
03 4.821: Pay bills on time to avoid late fees $7,288 - - - - $7,288
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $546 $31 $203
6,780
kWh
$343
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $635 $42 $635
21,168
kWh
- - -
06 2.7221: Lower temperature during the winter season and vice-versa $8,898 $1,119 $6,344
211,467
kWh
- $2,554
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $112,756 $41,810 $41,979
1,399,307
kWh
$70,777
-
kW-mo/yr
- -
TOTAL RECOMMENDED $132,210 $43,002 $50,599
1,686,654
kWh
$71,769
-
kW-mo/yr
$2,554
-
MMBtu
$7,288
TOTAL IMPLEMENTED $132,210 $43,002 $50,599
1,686,654
kWh
$71,769
-
kW-mo/yr
$2,554
-
MMBtu
$7,288
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs