ITAC Assessment: LE0536
ITAC logo
ITAC Assessment: LE0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 380,000
ft2
Annual Production 126,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $703,598 14,871,120
kWh
Electricity Demand $131,395 25,024
kW-mo/yr
Electricity Fees $125,179 -
Natural Gas $769,180 99,246
MMBtu
Waste Disposal Costs
Water Usage $45,728 4,726
Tgal
Water Disposal $30,473 1,771
Tgal
Other Liquid (non-haz) $262,666 3,719,340
gal
TOTAL YEARLY COSTS $2,068,219
RECOMMENDED SAVINGS* $306,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,791 - $1,553
33,046
kWh
$238
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,036 $2,440 $3,499
74,457
kWh
$537
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $27,974 $35,815 $24,189
514,667
kWh
$3,785
-
kW-mo/yr
- - - -
04 2.2442: Preheat combustion air with waste heat $28,034 $80,000 - - $28,034
-
MMBtu
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,556 $15,000 - - $4,556
-
MMBtu
- - -
06 3.1181: Eliminate a by-product $188,025 $700,000 $(-2,419.0)
(-51,450)
kWh
- - $(-63,229.0)
-
Tgal
$264,073
-
gal
$(-10,400.0)
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,147 $200,000 $47,264
1,005,618
kWh
$4,883
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $306,563 $1,033,255 $74,086
1,576,338
kWh
$9,443
-
kW-mo/yr
$32,590
-
MMBtu
$(-63,229.0)
-
Tgal
$264,073
-
gal
$(-10,400.0)
TOTAL IMPLEMENTED $33,801 $38,255 $29,241
622,170
kWh
$4,560
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs