ITAC Assessment: KU0334
ITAC logo
ITAC Assessment: KU0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TOOL STORAGE EQUIPMENT
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area
n/a
Annual Production 60,000
pieces
Production Hrs. Annual 5,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $452,723 9,068,289
kWh
Natural Gas $248,989 84,005
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $10,153 $1,800 $10,153
203,400
kWh
-
02 2.6223: Schedule use of elevators to conserve energy $336 $40 $336
6,741
kWh
-
03 2.2624: Use cold waste water to cool chiller feed water $22,062 $33,150 $22,062
441,970
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $3,034 $4,200 - $3,034
-
MMBtu
05 2.2437: Recover waste heat from equipment $6,382 - $(-29.0)
(-586)
kWh
$6,411
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $8,054 $16,950 - $8,054
-
MMBtu
07 2.2621: Modify refrigeration system to operate at a lower pressure $10,665 $22,600 $10,665
128,370
kWh
-
08 2.6232: Install set-back timers $454 $120 $454
9,086
kWh
-
TOTAL RECOMMENDED $61,140 $78,860 $43,641
788,981
kWh
$17,499
-
MMBtu
TOTAL IMPLEMENTED $61,140 $78,860 $43,641
788,981
kWh
$17,499
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs