| Assessment Year | 1991 |
|---|---|
| Principal Product | TOOL STORAGE EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 500 |
| Plant Area |
n/a
|
| Annual Production | 60,000
pieces
|
| Production Hrs. Annual | 5,736
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $452,723 | 9,068,289 |
kWh
|
$0.050 |
| Natural Gas | $248,989 | 84,005 |
MMBtu
|
$2.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $61,140 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $61,140 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $10,153 | $1,800 |
$10,153
203,400
kWh
|
- | |
| 02 | 2.6223: Schedule use of elevators to conserve energy | $336 | $40 |
$336
6,741
kWh
|
- | |
| 03 | 2.2624: Use cold waste water to cool chiller feed water | $22,062 | $33,150 |
$22,062
441,970
kWh
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $3,034 | $4,200 | - |
$3,034
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $6,382 | - |
$(-29.0)
(-586)
kWh
|
$6,411
-
MMBtu
|
|
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $8,054 | $16,950 | - |
$8,054
-
MMBtu
|
|
| 07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $10,665 | $22,600 |
$10,665
128,370
kWh
|
- | |
| 08 | 2.6232: Install set-back timers | $454 | $120 |
$454
9,086
kWh
|
- | |
| TOTAL RECOMMENDED | $61,140 | $78,860 |
$43,641
788,981
kWh
|
$17,499
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $61,140 | $78,860 |
$43,641
788,981
kWh
|
$17,499
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs