Assessment Year | 1991 |
---|---|
Principal Product | TOOL STORAGE EQUIPMENT |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
n/a
|
Annual Production | 60,000
pieces
|
Production Hrs. Annual | 5,736
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $452,723 | 9,068,289 |
kWh
|
$0.050 |
Natural Gas | $248,989 | 84,005 |
MMBtu
|
$2.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,140 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,140 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $10,153 | $1,800 |
$10,153
203,400
kWh
|
- | |
02 | 2.6223: Schedule use of elevators to conserve energy | $336 | $40 |
$336
6,741
kWh
|
- | |
03 | 2.2624: Use cold waste water to cool chiller feed water | $22,062 | $33,150 |
$22,062
441,970
kWh
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $3,034 | $4,200 | - |
$3,034
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $6,382 | - |
$(-29.0)
(-586)
kWh
|
$6,411
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $8,054 | $16,950 | - |
$8,054
-
MMBtu
|
|
07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $10,665 | $22,600 |
$10,665
128,370
kWh
|
- | |
08 | 2.6232: Install set-back timers | $454 | $120 |
$454
9,086
kWh
|
- | |
TOTAL RECOMMENDED | $61,140 | $78,860 |
$43,641
788,981
kWh
|
$17,499
-
MMBtu
|
||
TOTAL IMPLEMENTED | $61,140 | $78,860 |
$43,641
788,981
kWh
|
$17,499
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs