ITAC Assessment: KU0332
ITAC logo
ITAC Assessment: KU0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product REMANUFACTURED BRAKES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 155,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,398 521,395
kWh
Natural Gas $53,616 11,201
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1123: Install automatic stack damper $1,528 $3,500 - $1,528
-
MMBtu
02 2.7261: Install timers and/or thermostats $12,876 $13,800 - $12,876
-
MMBtu
03 2.6232: Install set-back timers $1,387 $2,760 $1,387
19,343
kWh
-
04 2.7141: Lower light fixtures in high ceiling areas $1,892 $4,400 $1,892
26,377
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $3,544 $10,200 $(-547.0)
(-7,620)
kWh
$4,091
-
MMBtu
06 2.2447: Heat water with exhaust heat $6,621 $8,000 $6,621
92,321
kWh
-
07 2.6242: Minimize operation of equipment maintained in standby condition $904 $600 $904
12,603
kWh
-
TOTAL RECOMMENDED $28,752 $43,260 $10,257
143,024
kWh
$18,495
-
MMBtu
TOTAL IMPLEMENTED $28,752 $43,260 $10,257
143,024
kWh
$18,495
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs