Assessment Year | 1991 |
---|---|
Principal Product | REMANUFACTURED BRAKES |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 155,000
pieces
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,398 | 521,395 |
kWh
|
$0.072 |
Natural Gas | $53,616 | 11,201 |
MMBtu
|
$4.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,752 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1123: Install automatic stack damper | $1,528 | $3,500 | - |
$1,528
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $12,876 | $13,800 | - |
$12,876
-
MMBtu
|
|
03 | 2.6232: Install set-back timers | $1,387 | $2,760 |
$1,387
19,343
kWh
|
- | |
04 | 2.7141: Lower light fixtures in high ceiling areas | $1,892 | $4,400 |
$1,892
26,377
kWh
|
- | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $3,544 | $10,200 |
$(-547.0)
(-7,620)
kWh
|
$4,091
-
MMBtu
|
|
06 | 2.2447: Heat water with exhaust heat | $6,621 | $8,000 |
$6,621
92,321
kWh
|
- | |
07 | 2.6242: Minimize operation of equipment maintained in standby condition | $904 | $600 |
$904
12,603
kWh
|
- | |
TOTAL RECOMMENDED | $28,752 | $43,260 |
$10,257
143,024
kWh
|
$18,495
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,752 | $43,260 |
$10,257
143,024
kWh
|
$18,495
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs