| Assessment Year | 1989 |
|---|---|
| Principal Product | LIQUID CARBON DIOXIDE |
| NAICS |
n/a
|
| SIC | 2813: Industrial Gases |
| Sales Range | $5 M to 10M |
| # of Employees | 20 |
| Plant Area |
n/a
|
| Annual Production | 82,490
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $534,247 | 11,597,890 |
kWh
|
$0.046 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $3,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,267 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $1,260 | - |
$1,260
47,773
kWh
|
- | |
| 02 | 2.5121: Redesign flow to minimize mass transfer length | $917 | - |
$917
34,877
kWh
|
- | |
| 03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $547 | $500 |
$547
21,102
kWh
|
- | |
| 04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $590 | $1,000 |
$590
21,981
kWh
|
- | |
| 05 | 3.4154: Eliminate leaks in water lines and valves | $130 | $220 | - | $130 | |
| TOTAL RECOMMENDED | $3,444 | $1,720 |
$3,314
125,733
kWh
|
$130 | ||
| TOTAL IMPLEMENTED | $1,267 | $1,720 |
$1,137
43,083
kWh
|
$130 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs