ITAC Assessment: AM0055
ITAC logo
ITAC Assessment: AM0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product LIQUID CARBON DIOXIDE
NAICS
n/a
SIC 2813: Industrial Gases
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area
n/a
Annual Production 82,490
ton
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $534,247 11,597,890
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $1,260 - $1,260
47,773
kWh
-
02 2.5121: Redesign flow to minimize mass transfer length $917 - $917
34,877
kWh
-
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $547 $500 $547
21,102
kWh
-
04 2.2444: Use hot process fluids to preheat incoming process fluids $590 $1,000 $590
21,981
kWh
-
05 3.4154: Eliminate leaks in water lines and valves $130 $220 - $130
TOTAL RECOMMENDED $3,444 $1,720 $3,314
125,733
kWh
$130
TOTAL IMPLEMENTED $1,267 $1,720 $1,137
43,083
kWh
$130
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs