ITAC Assessment: TT0018
ITAC logo
ITAC Assessment: TT0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Non-woven Fabric Treatment
NAICS 313320: Fabric Coating Mills
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 105,000
ft2
Annual Production 53,750,000
lb
Production Hrs. Annual 7,800
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,294 5,950,000
kWh
Electricity Demand $133,273 10,599
kW-mo/yr
Electricity Fees $12,940 -
Natural Gas $1,254,172 148,112
MMBtu
Fuel Oil #2 $26,006 2,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $368,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $314,600 $100,000 - - $314,600
-
MMBtu
-
02 3.4116: Meter recycled water (to reduce sewer charges) $33,000 $1,000 - - - $33,000
03 2.7142: Utilize higher efficiency lamps and/or ballasts $18,809 $22,423 $13,448
314,496
kWh
$5,361
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,637 $5,950 $743
17,411
kWh
$894
-
kW-mo/yr
- -
TOTAL RECOMMENDED $368,046 $129,373 $14,191
331,907
kWh
$6,255
-
kW-mo/yr
$314,600
-
MMBtu
$33,000
TOTAL IMPLEMENTED $53,446 $29,373 $14,191
331,907
kWh
$6,255
-
kW-mo/yr
- $33,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs