Assessment Year | 2019 |
---|---|
Principal Product | Glues, Adhesives, Rubber and Plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
66,780
ft2
|
Annual Production | 20,942,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $345,853 | 5,574,000 |
kWh
|
$0.062 | |
Electricity Demand | $106,922 | 20,616 |
kW-mo/yr
|
$5.19 | |
Electricity Fees | $84,342 | - |
|
- | |
Natural Gas | $170,560 | 46,634 |
MMBtu
|
$3.66 | |
Waste Disposal Costs | |||||
Water Usage | $16,068 | 16,678 |
Tgal
|
$0.96 | |
Water Disposal | $16,232 | 16,678 |
Tgal
|
$0.97 | |
TOTAL YEARLY COSTS | $739,977 | ||||
RECOMMENDED SAVINGS* | $118,943 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $34,366 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $13,580 | $31,585 |
$9,824
158,450
kWh
|
$3,756
-
kW-mo/yr
|
- | |
02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $13,500 | $33,800 | - | - | $13,500 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,245 | $18,331 |
$11,738
189,328
kWh
|
$1,507
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,084 | $4,798 |
$2,084
33,618
kWh
|
- | - | |
05 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $3,145 | $3,960 |
$3,145
50,728
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,312 | $464 |
$2,312
37,287
kWh
|
- | - | |
07 | 2.2522: Isolate hot or cold equipment | $1,061 | $2,108 |
$1,061
17,110
kWh
|
- | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $35,380 | $15,216 | - | - | $35,380 | |
09 | 4.112: Replace old machine with new automatic multi-station tool | $34,636 | $10,000 | - | - | $34,636 | |
TOTAL RECOMMENDED | $118,943 | $120,262 |
$30,164
486,521
kWh
|
$5,263
-
kW-mo/yr
|
$83,516 | ||
TOTAL IMPLEMENTED | $34,366 | $59,138 |
$29,103
469,411
kWh
|
$5,263
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs