ITAC Assessment: KU0329
ITAC logo
ITAC Assessment: KU0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product REFRIGERATED SALADS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,355 761,430
kWh
Natural Gas $19,268 4,434
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,675

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $2,299 $1,500 $2,299
-
kWh
- -
02 2.7441: Replace broken windows and/or window sash $4,269 $6,000 $4,269
62,427
kWh
- -
03 2.2628: Utilize a less expensive cooling method $7,435 $9,600 $7,435
108,734
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $394 $700 $361
5,275
kWh
- $33
05 2.6232: Install set-back timers $523 $400 $523
7,327
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,025 - $1,025
14,361
kWh
- -
07 2.2511: Insulate bare equipment $3,165 $2,804 $2,238
31,360
kWh
$927
-
MMBtu
-
TOTAL RECOMMENDED $19,110 $21,004 $18,150
229,484
kWh
$927
-
MMBtu
$33
TOTAL IMPLEMENTED $11,675 $11,404 $10,715
120,750
kWh
$927
-
MMBtu
$33
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs