Assessment Year | 1990 |
---|---|
Principal Product | GARMENTS |
NAICS |
n/a
|
SIC | 2326: Men's and Boys' Work Clothing |
Sales Range | n/a |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 152,476
pieces
|
Production Hrs. Annual | 3,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,217 | 2,354,045 |
kWh
|
$0.061 |
Natural Gas | $33,310 | 7,682 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,148 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,421 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $7,470 | $1,250 |
$7,470
122,802
kWh
|
- | |
02 | 2.2511: Insulate bare equipment | $5,349 | $12,000 |
$5,349
87,925
kWh
|
- | |
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $3,611 | $3,400 | - |
$3,611
-
MMBtu
|
|
04 | 2.7141: Lower light fixtures in high ceiling areas | $2,567 | $987 |
$2,567
42,204
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $2,509 | $3,000 |
$1,550
25,498
kWh
|
$959
-
MMBtu
|
|
06 | 2.7261: Install timers and/or thermostats | $2,487 | $2,600 | - |
$2,487
-
MMBtu
|
|
07 | 2.6232: Install set-back timers | $1,982 | $2,300 |
$1,982
32,532
kWh
|
- | |
08 | 2.2437: Recover waste heat from equipment | $1,480 | $2,400 |
$1,480
24,326
kWh
|
- | |
09 | 2.2522: Isolate hot or cold equipment | $1,337 | $355 |
$1,337
21,981
kWh
|
- | |
10 | 2.7122: Disconnect ballasts | $178 | $300 |
$178
2,931
kWh
|
- | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $178 | - |
$178
2,931
kWh
|
- | |
TOTAL RECOMMENDED | $29,148 | $28,592 |
$22,091
363,130
kWh
|
$7,057
-
MMBtu
|
||
TOTAL IMPLEMENTED | $24,421 | $25,005 |
$17,364
285,463
kWh
|
$7,057
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs