ITAC Assessment: KU0327
ITAC logo
ITAC Assessment: KU0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product GARMENTS
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range n/a
# of Employees 300
Plant Area
n/a
Annual Production 152,476
pieces
Production Hrs. Annual 3,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,217 2,354,045
kWh
Natural Gas $33,310 7,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,470 $1,250 $7,470
122,802
kWh
-
02 2.2511: Insulate bare equipment $5,349 $12,000 $5,349
87,925
kWh
-
03 2.2443: Re-use or recycle hot or cold process exhaust air $3,611 $3,400 - $3,611
-
MMBtu
04 2.7141: Lower light fixtures in high ceiling areas $2,567 $987 $2,567
42,204
kWh
-
05 2.2511: Insulate bare equipment $2,509 $3,000 $1,550
25,498
kWh
$959
-
MMBtu
06 2.7261: Install timers and/or thermostats $2,487 $2,600 - $2,487
-
MMBtu
07 2.6232: Install set-back timers $1,982 $2,300 $1,982
32,532
kWh
-
08 2.2437: Recover waste heat from equipment $1,480 $2,400 $1,480
24,326
kWh
-
09 2.2522: Isolate hot or cold equipment $1,337 $355 $1,337
21,981
kWh
-
10 2.7122: Disconnect ballasts $178 $300 $178
2,931
kWh
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $178 - $178
2,931
kWh
-
TOTAL RECOMMENDED $29,148 $28,592 $22,091
363,130
kWh
$7,057
-
MMBtu
TOTAL IMPLEMENTED $24,421 $25,005 $17,364
285,463
kWh
$7,057
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs