ITAC Assessment: GT0924
ITAC logo
ITAC Assessment: GT0924
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product RTV, Compact Tractor, Zero-Turn Mower
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range greater than $500
M
# of Employees 2,000
Plant Area 1,179,000
ft2
Annual Production 120,894
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,362,220 41,456,468
kWh
Natural Gas $1,073,277 203,385
MMBtu
TOTAL YEARLY COSTS $3,435,497
RECOMMENDED SAVINGS* $218,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,479

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,068 $3,500 $16,068
281,901
kWh
-
02 2.2511: Insulate bare equipment $7,338 $6,225 - $7,338
-
MMBtu
03 2.7135: Install occupancy sensors $5,577 $13,969 $5,577
97,843
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,833 $79,937 $14,833
260,235
kWh
-
05 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $174,595 $1,725,000 $299,250
5,250,000
kWh
$(-124,654.9)
-
MMBtu
TOTAL RECOMMENDED $218,412 $1,828,630 $335,729
5,889,979
kWh
$(-117,316.6)
-
MMBtu
TOTAL IMPLEMENTED $36,479 $97,405 $36,479
639,979
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs