ITAC Assessment: KU0325
ITAC logo
ITAC Assessment: KU0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product GRAY IRON CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 105
Plant Area
n/a
Annual Production 2,900
ton
Production Hrs. Annual 4,700
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,784 1,527,843
kWh
Natural Gas $64,982 41,468
MMBtu
Other Energy $146,635 22,594
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,296

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $16,128 $20,800 - - $16,128
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,200 $3,078 $4,438
53,927
kWh
- - $762
03 2.2531: Re-size charging openings or add movable cover or door $391 $466 - $391
-
MMBtu
- -
04 2.7261: Install timers and/or thermostats $1,788 $2,802 - $1,788
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $675 $1,416 $675
8,206
kWh
- - -
06 2.7314: Reduce ventilation air $8,297 $11,700 $4,607
55,979
kWh
$3,690
-
MMBtu
- -
07 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $50,733 - - $15,072
-
MMBtu
$26,661
-
MMBtu
$9,000
TOTAL RECOMMENDED $83,212 $40,262 $9,720
118,112
kWh
$20,941
-
MMBtu
$42,789
-
MMBtu
$9,762
TOTAL IMPLEMENTED $65,296 $16,660 $9,720
118,112
kWh
$19,153
-
MMBtu
$26,661
-
MMBtu
$9,762
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs