ITAC Assessment: KU0324
ITAC logo
ITAC Assessment: KU0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ELECTRICAL COMPONENTS
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 4,574,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,553 10,601,114
kWh
Natural Gas $12,117 3,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7444: Close holes and openings in building such as broken windows $1,876 $410 $1,876
51,583
kWh
02 2.2694: Use highest temperature for chilling or cold storage $1,759 $4,000 $1,759
48,359
kWh
03 2.6232: Install set-back timers $821 $600 $821
22,567
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $544 - $544
14,947
kWh
05 2.6121: Reduce hot water temperature to the minimum required $139 - $139
3,810
kWh
TOTAL RECOMMENDED $5,139 $5,010 $5,139
141,266
kWh
TOTAL IMPLEMENTED $2,303 $4,000 $2,303
63,306
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs