ITAC Assessment: KU0292
ITAC logo
ITAC Assessment: KU0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product LINGERIE AND LOUNGEWEAR
NAICS
n/a
SIC 2341: Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 520,000
pieces
Production Hrs. Annual 2,520
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,904 2,542,204
kWh
Natural Gas $24,513 5,462
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $10,146 $800 $2,145
45,135
kWh
$8,001
-
MMBtu
02 2.1213: Direct warmest air to combustion intake $751 $700 $181
3,810
kWh
$570
-
MMBtu
03 2.7422: Plant trees or shrubs near windows to shield from sunlight $591 $1,350 $474
9,965
kWh
$117
-
MMBtu
04 2.6232: Install set-back timers $3,496 $1,000 $3,496
73,564
kWh
-
05 2.5122: Replace high resistance ducts, pipes, and fittings $167 $120 $167
3,517
kWh
-
06 2.3191: Use demand controller or load shedder $2,284 $3,144 $2,284
-
kWh
-
TOTAL RECOMMENDED $17,435 $7,114 $8,747
135,991
kWh
$8,688
-
MMBtu
TOTAL IMPLEMENTED $13,809 $1,920 $5,808
122,216
kWh
$8,001
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs