Assessment Year | 1989 |
---|---|
Principal Product | FOOD PROCESSING EQUIPMENT |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 4,930
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,457 | 830,891 |
kWh
|
$0.076 |
Natural Gas | $15,686 | 3,880 |
MMBtu
|
$4.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,963 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,528 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $582 | $1,068 |
$582
7,620
kWh
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $2,256 | $3,800 |
$605
7,913
kWh
|
$901
-
MMBtu
|
$750 | |
03 | 2.7314: Reduce ventilation air | $2,145 | $400 |
$493
6,448
kWh
|
$1,652
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,836 | $100 |
$1,836
24,033
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,101 | $270 |
$2,101
27,550
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,179 | $3,864 |
$3,179
41,618
kWh
|
- | - | |
07 | 2.6121: Reduce hot water temperature to the minimum required | $204 | - |
$67
879
kWh
|
$137
-
MMBtu
|
- | |
08 | 2.4312: Improve lubrication practices | $716 | - |
$716
9,379
kWh
|
- | - | |
09 | 2.7441: Replace broken windows and/or window sash | $349 | $358 | - |
$349
-
MMBtu
|
- | |
10 | 2.6214: Shut off pilots in standby equipment | $343 | - | - |
$743
-
MMBtu
|
$(-400.0) | |
11 | 2.7261: Install timers and/or thermostats | $1,252 | $700 |
$448
5,862
kWh
|
$804
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $14,963 | $10,560 |
$10,027
131,302
kWh
|
$4,586
-
MMBtu
|
$350 | ||
TOTAL IMPLEMENTED | $10,528 | $6,660 |
$7,586
99,356
kWh
|
$2,942
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs