ITAC Assessment: KU0275
ITAC logo
ITAC Assessment: KU0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FOOD PROCESSING EQUIPMENT
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 3,000
pieces
Production Hrs. Annual 4,930
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,457 830,891
kWh
Natural Gas $15,686 3,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,528

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $582 $1,068 $582
7,620
kWh
- -
02 2.4322: Use or replace with energy efficient substitutes $2,256 $3,800 $605
7,913
kWh
$901
-
MMBtu
$750
03 2.7314: Reduce ventilation air $2,145 $400 $493
6,448
kWh
$1,652
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,836 $100 $1,836
24,033
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,101 $270 $2,101
27,550
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,179 $3,864 $3,179
41,618
kWh
- -
07 2.6121: Reduce hot water temperature to the minimum required $204 - $67
879
kWh
$137
-
MMBtu
-
08 2.4312: Improve lubrication practices $716 - $716
9,379
kWh
- -
09 2.7441: Replace broken windows and/or window sash $349 $358 - $349
-
MMBtu
-
10 2.6214: Shut off pilots in standby equipment $343 - - $743
-
MMBtu
$(-400.0)
11 2.7261: Install timers and/or thermostats $1,252 $700 $448
5,862
kWh
$804
-
MMBtu
-
TOTAL RECOMMENDED $14,963 $10,560 $10,027
131,302
kWh
$4,586
-
MMBtu
$350
TOTAL IMPLEMENTED $10,528 $6,660 $7,586
99,356
kWh
$2,942
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs