ITAC Assessment: KU0254
ITAC logo
ITAC Assessment: KU0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HEAVY COMMERCIAL TRUCKS
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 750
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,285 2,110,199
kWh
Natural Gas $45,414 11,517
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,185 $2,000 $3,185
41,618
kWh
-
02 2.7261: Install timers and/or thermostats $191 - $159
2,052
kWh
$32
-
MMBtu
03 2.2532: Use only amount of air necessary to prevent explosion hazard $1,539 - $46
586
kWh
$1,493
-
MMBtu
04 2.7441: Replace broken windows and/or window sash $1,773 $1,800 - $1,773
-
MMBtu
05 2.6214: Shut off pilots in standby equipment $347 - - $347
-
MMBtu
06 2.1123: Install automatic stack damper $2,033 $2,125 - $2,033
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,741 $1,680 $3,741
48,359
kWh
-
08 2.4312: Improve lubrication practices $159 - $159
2,052
kWh
-
TOTAL RECOMMENDED $12,968 $7,605 $7,290
94,667
kWh
$5,678
-
MMBtu
TOTAL IMPLEMENTED $8,971 $3,680 $7,131
92,615
kWh
$1,840
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs