ITAC Assessment: KU0251
ITAC logo
ITAC Assessment: KU0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PRESSURE SENSITIVE LABEL
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,430 1,676,143
kWh
Natural Gas $5,573 1,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,232

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,144 $4,044 $6,144
81,477
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $354 $400 $354
4,689
kWh
- -
03 2.4312: Improve lubrication practices $530 - $530
7,034
kWh
- -
04 2.1123: Install automatic stack damper $297 $150 - $297
-
MMBtu
-
05 2.7221: Lower temperature during the winter season and vice-versa $287 - $287
3,810
kWh
- -
06 2.7442: Keep doors and windows shut when not on use $209 - - $209
-
MMBtu
-
07 2.8121: Apply for tax-free status for energy purchases $173 - - $173
-
MMBtu
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $187 - - $237
-
MMBtu
$(-50.0)
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $133 - $133
1,758
kWh
- -
TOTAL RECOMMENDED $8,314 $4,594 $7,448
98,768
kWh
$916
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $1,232 - $663
8,792
kWh
$619
-
MMBtu
$(-50.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs