ITAC Assessment: KU0246
ITAC logo
ITAC Assessment: KU0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HEADLIGHT AIMING EQUIPMENT
NAICS
n/a
SIC 3647: Vehicular Lighting Equipment
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area
n/a
Annual Production 6,500,000
pieces
Production Hrs. Annual 4,318
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,288 2,625,147
kWh
Natural Gas $6,177 1,754
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,686 $1,650 $2,686
51,583
kWh
- -
02 2.7261: Install timers and/or thermostats $2,577 $800 - $2,577
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,601 $300 $2,601
50,117
kWh
- -
04 2.7226: Use computer programs to optimize hvac performance $1,886 $3,600 $1,886
36,342
kWh
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,278 - $1,778
-
kWh
- $(-500.0)
06 2.2511: Insulate bare equipment $791 $200 $791
15,240
kWh
- -
07 2.7441: Replace broken windows and/or window sash $239 $200 - $239
-
MMBtu
-
08 2.6121: Reduce hot water temperature to the minimum required $116 - $46
879
kWh
$70
-
MMBtu
-
TOTAL RECOMMENDED $12,174 $6,750 $9,788
154,161
kWh
$2,886
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $11,383 $6,550 $8,997
138,921
kWh
$2,886
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs