| Assessment Year | 1988 |
|---|---|
| Principal Product | HEADLIGHT AIMING EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3647: Vehicular Lighting Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 195 |
| Plant Area |
n/a
|
| Annual Production | 6,500,000
pieces
|
| Production Hrs. Annual | 4,318
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $136,288 | 2,625,147 |
kWh
|
$0.052 |
| Natural Gas | $6,177 | 1,754 |
MMBtu
|
$3.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,174 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,383 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,686 | $1,650 |
$2,686
51,583
kWh
|
- | - | |
| 02 | 2.7261: Install timers and/or thermostats | $2,577 | $800 | - |
$2,577
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,601 | $300 |
$2,601
50,117
kWh
|
- | - | |
| 04 | 2.7226: Use computer programs to optimize hvac performance | $1,886 | $3,600 |
$1,886
36,342
kWh
|
- | - | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,278 | - |
$1,778
-
kWh
|
- | $(-500.0) | |
| 06 | 2.2511: Insulate bare equipment | $791 | $200 |
$791
15,240
kWh
|
- | - | |
| 07 | 2.7441: Replace broken windows and/or window sash | $239 | $200 | - |
$239
-
MMBtu
|
- | |
| 08 | 2.6121: Reduce hot water temperature to the minimum required | $116 | - |
$46
879
kWh
|
$70
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $12,174 | $6,750 |
$9,788
154,161
kWh
|
$2,886
-
MMBtu
|
$(-500.0) | ||
| TOTAL IMPLEMENTED | $11,383 | $6,550 |
$8,997
138,921
kWh
|
$2,886
-
MMBtu
|
$(-500.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs