ITAC Assessment: KU0243
ITAC logo
ITAC Assessment: KU0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BUSINESS FORMS & LABELS
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,310 1,932,005
kWh
Natural Gas $721 200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,948

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,552 $9,509 $10,552
156,506
kWh
-
02 2.2437: Recover waste heat from equipment $10,137 $20,300 $10,137
150,352
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $8,418 $4,800 $8,418
124,853
kWh
-
04 2.7245: Use direct air supply to exhaust hoods $8,090 $4,000 $8,090
119,871
kWh
-
05 2.7261: Install timers and/or thermostats $2,035 $200 $2,035
30,188
kWh
-
06 2.4312: Improve lubrication practices $2,035 - $2,035
30,188
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,798 $1,320 $1,798
26,671
kWh
-
08 3.4151: Minimize water usage $1,298 $1,320 - $1,298
09 2.4221: Install compressor air intakes in coolest locations $534 $450 $534
7,913
kWh
-
10 2.6121: Reduce hot water temperature to the minimum required $454 - $454
6,741
kWh
-
11 2.4227: Use compressor air filters $128 - $158
2,345
kWh
$(-30.0)
TOTAL RECOMMENDED $45,479 $41,899 $44,211
655,628
kWh
$1,268
TOTAL IMPLEMENTED $14,948 $6,770 $14,978
222,158
kWh
$(-30.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs