ITAC Assessment: GT0624
ITAC logo
ITAC Assessment: GT0624
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Chemical Adsorbent
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 44,000
ft2
Annual Production 3,300,000
lb
Production Hrs. Annual 2,300
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,073 756,741
kWh
Electricity Demand $34,753 2,320
kW-mo/yr
Electricity Fees $5,349 -
Natural Gas $30,071 5,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7141: Lower light fixtures in high ceiling areas $2,995 $4,380 $807
31,946
kWh
$1,952
-
kW-mo/yr
$236 - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,420 $900 - - - $1,420
-
MMBtu
- -
03 2.6218: Turn off equipment when not in use $1,480 $150 - - - $1,480
-
MMBtu
- -
04 2.4224: Upgrade controls on compressors $2,470 - $228
9,086
kWh
$2,127
-
kW-mo/yr
$115 - - -
05 2.4221: Install compressor air intakes in coolest locations $80 $250 $19
879
kWh
$60
-
kW-mo/yr
$1 - - -
06 3.2121: Convert to electrostatic powder coating $6,540 - - - - - - $6,540
07 3.4114: Replace city water with recycled water via cooling tower $1,600 $1,320 - - - - - $1,600
08 4.131: Modify process to reduce material use/cost $18,900 $4,000 - - - - $13,500 $5,400
TOTAL RECOMMENDED $35,485 $11,000 $1,054
41,911
kWh
$4,139
-
kW-mo/yr
$352 $2,900
-
MMBtu
$13,500 $13,540
TOTAL IMPLEMENTED $5,895 $5,430 $807
31,946
kWh
$1,952
-
kW-mo/yr
$236 $2,900
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs