ITAC Assessment: KU0241
ITAC logo
ITAC Assessment: KU0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ELECTRICAL WIRE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 208
Plant Area
n/a
Annual Production 50,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $810,004 15,521,981
kWh
Natural Gas $61,054 17,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,464

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $10,902 - $10,902
208,968
kWh
-
02 2.7261: Install timers and/or thermostats $15,123 $6,000 - $15,123
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,831 $3,786 $14,831
284,291
kWh
-
04 2.4133: Use most efficient type of electric motors $13,027 $7,700 $13,027
249,707
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,422 - $6,422
123,095
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $4,159 $500 $4,159
79,719
kWh
-
07 2.2511: Insulate bare equipment $1,698 $1,500 $1,972
37,808
kWh
$(-274.0)
-
MMBtu
TOTAL RECOMMENDED $66,162 $19,486 $51,313
983,588
kWh
$14,849
-
MMBtu
TOTAL IMPLEMENTED $64,464 $17,986 $49,341
945,780
kWh
$15,123
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs