ITAC Assessment: KU0231
ITAC logo
ITAC Assessment: KU0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product GASKET DIE CUTS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 65,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,629 350,234
kWh
Natural Gas $6,679 1,438
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,553 $2,059 $4,553
50,410
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $847 $100 $847
9,379
kWh
- -
03 2.7261: Install timers and/or thermostats $809 $40 $159
1,758
kWh
$650
-
MMBtu
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $445 $600 $556
6,155
kWh
$(-111.0)
-
MMBtu
-
05 2.4312: Improve lubrication practices $424 $600 $424
4,689
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $212 $120 $212
2,345
kWh
- -
07 2.6121: Reduce hot water temperature to the minimum required $211 - $164
1,758
kWh
$47
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $132 $250 $132
1,465
kWh
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $(-79.0) - - $121
-
MMBtu
$(-200.0)
TOTAL RECOMMENDED $7,554 $3,769 $7,047
77,959
kWh
$707
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $2,424 $860 $1,806
19,929
kWh
$818
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs