ITAC Assessment: OK0535
ITAC logo
ITAC Assessment: OK0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom made pressure vessels
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 37
Plant Area 90,000
ft2
Annual Production 60
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,937 976,553
kWh
Electricity Demand $35,801 378
kW-mo/yr
Electricity Fees $1,824 -
Natural Gas $22,031 4,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.3132: Recharge batteries on during off-peak demand periods $15,799 - - $15,799
-
kW-mo/yr
- -
02 2.3312: Install efficient rectifiers $1,114 $2,963 $408
15,533
kWh
$706
-
kW-mo/yr
- -
03 3.3128: Utilize other methods to remove contaminants $4,256 $6,500 - - - $4,256
-
lb
04 3.5316: Contract a wood pallet recycling company $1,050 - - - $1,050
-
lb
-
05 3.1192: Reduce scrap production $17,171 $3,995 - - $17,171
-
lb
-
06 3.1191: Change procedures / equipment / operating conditions $195 - - - - $195
-
lb
TOTAL RECOMMENDED $39,585 $13,458 $408
15,533
kWh
$16,505
-
kW-mo/yr
$18,221
-
lb
$4,451
-
lb
TOTAL IMPLEMENTED $5,370 $9,463 $408
15,533
kWh
$706
-
kW-mo/yr
- $4,256
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs