ITAC Assessment: KU0198
ITAC logo
ITAC Assessment: KU0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product LIQUID DETERGENT
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 17
Plant Area
n/a
Annual Production 38,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,283 582,063
kWh
Natural Gas $356,456 105,904
MMBtu
Other Energy $292,479 70,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.2121: Increase amount of condensate returned $26,112 $21,000 - - $25,525
-
MMBtu
$587
02 2.2135: Repair and eliminate steam leaks $17,771 $880 - - $17,771
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,569 - - $3,569
-
MMBtu
- -
04 2.2163: Use minimum steam operating pressure $2,706 $5,000 - $2,706
-
MMBtu
- -
05 2.4312: Improve lubrication practices $2,456 $1,724 $2,456
58,910
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,845 $3,666 $1,845
44,256
kWh
- - -
07 2.6232: Install set-back timers $1,185 $60 $1,185
28,429
kWh
- - -
08 2.7261: Install timers and/or thermostats $562 $124 $232
5,569
kWh
$330
-
MMBtu
- -
TOTAL RECOMMENDED $56,206 $32,454 $5,718
137,164
kWh
$6,605
-
MMBtu
$43,296
-
MMBtu
$587
TOTAL IMPLEMENTED $30,094 $11,454 $5,718
137,164
kWh
$6,605
-
MMBtu
$17,771
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs