ITAC Assessment: KU0173
ITAC logo
ITAC Assessment: KU0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product BROCHURES,BOOKLETS,CARDS
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 127
Plant Area
n/a
Annual Production 45,000,000
pieces
Production Hrs. Annual 6,912
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,611 1,354,924
kWh
Natural Gas $3,011 727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,042 $3,793 $6,042
93,494
kWh
- -
02 2.7261: Install timers and/or thermostats $1,572 $1,200 - $1,572
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $1,053 $1,000 - $1,453
-
MMBtu
$(-400.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $890 $20 $890
13,775
kWh
- -
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $777 $200 $777
12,016
kWh
- -
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $549 $1,000 $549
8,499
kWh
- -
07 2.4312: Improve lubrication practices $398 $350 $398
6,155
kWh
- -
08 2.6121: Reduce hot water temperature to the minimum required $272 - $57
879
kWh
$215
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $152 $150 $152
2,345
kWh
- -
TOTAL RECOMMENDED $11,705 $7,713 $8,865
137,163
kWh
$3,240
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $8,379 $4,363 $8,164
126,319
kWh
$215
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs