ITAC Assessment: CM1016
ITAC logo
ITAC Assessment: CM1016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Bakery, Dry Mixes
NAICS 311824: Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $50
M
to 100
M
# of Employees 40
Plant Area 154,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,944 4,478,926
kWh
Electricity Demand $181,568 9,409
kW-mo/yr
Electricity Fees $60,782 -
Natural Gas $350,420 40,985
MMBtu
TOTAL YEARLY COSTS $804,714
RECOMMENDED SAVINGS* $97,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $2,957 - $81,019
799,000
kWh
- - - $(-78,062.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,413 $6,724 $2,577
54,409
kWh
$1,836
-
kW-mo/yr
- - -
03 2.2136: Install / repair insulation on steam lines $44,187 $184,569 $1,976
41,771
kWh
- $42,211
-
MMBtu
- -
04 2.8121: Apply for tax-free status for energy purchases $46,159 $16,000 - - - $46,159 -
TOTAL RECOMMENDED $97,716 $207,293 $85,572
895,180
kWh
$1,836
-
kW-mo/yr
$42,211
-
MMBtu
$46,159 $(-78,062.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs