| Assessment Year | 1985 |
|---|---|
| Principal Product | CORRUGATED SHIPPING CONTAINERS |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
n/a
|
| Annual Production | 26,000
ton
|
| Production Hrs. Annual | 5,124
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $193,842 | 3,091,149 |
kWh
|
$0.063 |
| Natural Gas | $206,164 | 55,223 |
MMBtu
|
$3.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $167,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $58,271 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $97,361 | $494,400 |
$132,356
2,111,665
kWh
|
$(-34,995.0)
-
MMBtu
|
|
| 02 | 2.7261: Install timers and/or thermostats | $29,255 | $18 |
$478
7,620
kWh
|
$28,777
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,755 | $2,656 |
$9,755
155,627
kWh
|
- | |
| 04 | 2.2135: Repair and eliminate steam leaks | $5,297 | $300 | - |
$5,297
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $4,901 | $6,000 | - |
$4,901
-
MMBtu
|
|
| 06 | 2.2121: Increase amount of condensate returned | $1,746 | $1,000 | - |
$1,746
-
MMBtu
|
|
| 07 | 2.4312: Improve lubrication practices | $6,613 | $2,166 |
$6,613
105,510
kWh
|
- | |
| 08 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,764 | $700 | - |
$2,764
-
MMBtu
|
|
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $735 | $30 |
$735
11,723
kWh
|
- | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $606 | $300 |
$606
9,672
kWh
|
- | |
| 11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $147 | $20 |
$147
2,345
kWh
|
- | |
| 12 | 2.2511: Insulate bare equipment | $2,018 | $800 | - |
$2,018
-
MMBtu
|
|
| 13 | 2.2135: Repair and eliminate steam leaks | $1,835 | $300 | - |
$1,835
-
MMBtu
|
|
| 14 | 2.2122: Install / repair insulation on condensate lines | $1,514 | $1,300 | - |
$1,514
-
MMBtu
|
|
| 15 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $962 | $400 | - |
$962
-
MMBtu
|
|
| 16 | 2.2511: Insulate bare equipment | $1,000 | $591 |
$1,194
19,050
kWh
|
$(-194.0)
-
MMBtu
|
|
| 17 | 2.6218: Turn off equipment when not in use | $551 | - |
$551
8,792
kWh
|
- | |
| TOTAL RECOMMENDED | $167,060 | $510,981 |
$152,435
2,432,004
kWh
|
$14,625
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $58,271 | $12,915 |
$13,466
214,829
kWh
|
$44,805
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs