ITAC Assessment: KU0167
ITAC logo
ITAC Assessment: KU0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HEAVY CONSTRUCTION EQUIP
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 2,134
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,410 280,481
kWh
Natural Gas $15,601 3,216
MMBtu
Fuel Oil #2 $2,800 392
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $10,250 $80 $584
6,448
kWh
$9,666
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,664 $3,439 $3,664
40,445
kWh
- -
03 2.1123: Install automatic stack damper $1,057 $800 - $1,057
-
MMBtu
-
04 2.7441: Replace broken windows and/or window sash $999 $750 - $999
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $149 - - $364
-
MMBtu
$(-215.0)
TOTAL RECOMMENDED $16,119 $5,069 $4,248
46,893
kWh
$12,086
-
MMBtu
$(-215.0)
TOTAL IMPLEMENTED $15,120 $4,319 $4,248
46,893
kWh
$11,087
-
MMBtu
$(-215.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs