Assessment Year | 1985 |
---|---|
Principal Product | NOVELTY ICE CREAM & ICE |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $639,674 | 14,917,937 |
kWh
|
$0.043 |
Natural Gas | $173,393 | 42,375 |
MMBtu
|
$4.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,335 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,513 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $28,837 | $33,000 | - |
$13,337
-
MMBtu
|
$15,500 | |
02 | 2.2447: Heat water with exhaust heat | $20,949 | $37,000 | - |
$20,949
-
MMBtu
|
- | |
03 | 2.3191: Use demand controller or load shedder | $16,822 | $9,000 |
$16,822
-
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,248 | $4,815 |
$7,248
169,109
kWh
|
- | - | |
05 | 2.4312: Improve lubrication practices | $10,224 | $8,000 |
$10,224
238,570
kWh
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,321 | $1,020 |
$4,321
100,821
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,984 | $50 |
$1,984
46,307
kWh
|
- | - | |
08 | 2.2437: Recover waste heat from equipment | $998 | $450 | - |
$998
-
MMBtu
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $468 | $400 |
$468
10,844
kWh
|
- | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $484 | $400 |
$484
11,430
kWh
|
- | - | |
TOTAL RECOMMENDED | $92,335 | $94,135 |
$41,551
577,081
kWh
|
$35,284
-
MMBtu
|
$15,500 | ||
TOTAL IMPLEMENTED | $75,513 | $85,135 |
$24,729
577,081
kWh
|
$35,284
-
MMBtu
|
$15,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs