ITAC Assessment: KU0165
ITAC logo
ITAC Assessment: KU0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product NOVELTY ICE CREAM & ICE
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $639,674 14,917,937
kWh
Natural Gas $173,393 42,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2121: Increase amount of condensate returned $28,837 $33,000 - $13,337
-
MMBtu
$15,500
02 2.2447: Heat water with exhaust heat $20,949 $37,000 - $20,949
-
MMBtu
-
03 2.3191: Use demand controller or load shedder $16,822 $9,000 $16,822
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,248 $4,815 $7,248
169,109
kWh
- -
05 2.4312: Improve lubrication practices $10,224 $8,000 $10,224
238,570
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $4,321 $1,020 $4,321
100,821
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,984 $50 $1,984
46,307
kWh
- -
08 2.2437: Recover waste heat from equipment $998 $450 - $998
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $468 $400 $468
10,844
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $484 $400 $484
11,430
kWh
- -
TOTAL RECOMMENDED $92,335 $94,135 $41,551
577,081
kWh
$35,284
-
MMBtu
$15,500
TOTAL IMPLEMENTED $75,513 $85,135 $24,729
577,081
kWh
$35,284
-
MMBtu
$15,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs