Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product WHEAT FLOUR
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area
n/a
Annual Production 51,300,000
lb
Production Hrs. Annual 6,840
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,200,339 27,067,116
kWh
Natural Gas $143,559 33,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $43,682 $23,000 - $43,682
-
MMBtu
02 2.3191: Use demand controller or load shedder $32,837 $12,000 $32,837
-
kWh
-
03 2.4312: Improve lubrication practices $18,095 $9,000 $18,095
408,265
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,122 $9,277 $20,122
453,986
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,223 $500 $10,223
230,657
kWh
-
06 2.2136: Install / repair insulation on steam lines $5,700 $7,958 - $5,700
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,806 $1,900 $1,806
40,739
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $2,520 $1,500 $2,520
56,858
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $1,806 $3,550 $1,806
40,739
kWh
-
10 2.6218: Turn off equipment when not in use $234 - $234
5,275
kWh
-
11 2.4133: Use most efficient type of electric motors $1,338 $2,000 $1,338
30,188
kWh
-
12 2.6218: Turn off equipment when not in use $2,377 $4,600 $2,377
53,634
kWh
-
13 2.6121: Reduce hot water temperature to the minimum required $416 - $416
9,379
kWh
-
14 2.1311: Replace electrically-operated equipment with fossil fuel equipment $337 $600 $572
12,896
kWh
$(-235.0)
-
MMBtu
TOTAL RECOMMENDED $141,493 $75,885 $92,346
1,342,616
kWh
$49,147
-
MMBtu
TOTAL IMPLEMENTED $43,682 $23,000 - $43,682
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs