| Assessment Year | 1984 |
|---|---|
| Principal Product | PAINT |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 48 |
| Plant Area |
n/a
|
| Annual Production | 1,300
Tgal
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $55,861 | 796,014 |
kWh
|
$0.070 |
| Other Energy | $49,826 | 7,817 |
MMBtu
|
$6.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,352 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,016 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Energy Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $4,970 | - |
$473
6,741
kWh
|
$4,497
-
MMBtu
|
- | |
| 02 | 2.4312: Improve lubrication practices | $1,892 | $2,250 |
$1,892
26,964
kWh
|
- | - | |
| 03 | 2.3191: Use demand controller or load shedder | $2,901 | $4,000 |
$2,901
-
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $679 | $50 |
$679
9,672
kWh
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $226 | $20 |
$226
3,224
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $165 | $450 |
$165
2,345
kWh
|
- | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $108 | $30 | - |
$108
-
MMBtu
|
- | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $4,299 | $3,290 |
$4,299
61,254
kWh
|
- | - | |
| 10 | 2.1232: Keep boiler tubes clean | $249 | - | - |
$529
-
MMBtu
|
$(-280.0) | |
| 11 | 2.1222: Install turbulators | $1,274 | $1,200 | - |
$1,274
-
MMBtu
|
- | |
| 12 | 2.1123: Install automatic stack damper | $2,255 | $2,000 | - |
$2,255
-
MMBtu
|
- | |
| 13 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $847 | $250 | - |
$847
-
MMBtu
|
- | |
| 14 | 2.2122: Install / repair insulation on condensate lines | $134 | $350 | - |
$134
-
MMBtu
|
- | |
| 15 | 2.2136: Install / repair insulation on steam lines | $4,262 | $3,348 | - |
$4,262
-
MMBtu
|
- | |
| 16 | 2.7221: Lower temperature during the winter season and vice-versa | $299 | - | - |
$299
-
MMBtu
|
- | |
| 17 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,440 | $159 | - |
$1,440
-
MMBtu
|
- | |
| 18 | 2.7211: Clean and maintain refrigerant condensers and towers | $352 | - |
$432
6,155
kWh
|
- | $(-80.0) | |
| TOTAL RECOMMENDED | $26,352 | $17,397 |
$11,067
116,355
kWh
|
$15,645
-
MMBtu
|
$(-360.0) | ||
| TOTAL IMPLEMENTED | $9,016 | $3,330 |
$2,962
42,205
kWh
|
$6,414
-
MMBtu
|
$(-360.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Energy Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs