ITAC Assessment: KU0145
ITAC logo
ITAC Assessment: KU0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PAINT
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area
n/a
Annual Production 1,300
Tgal
Production Hrs. Annual 2,210
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,861 796,014
kWh
Other Energy $49,826 7,817
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings Administrative Changes Savings
01 2.2532: Use only amount of air necessary to prevent explosion hazard $4,970 - $473
6,741
kWh
$4,497
-
MMBtu
-
02 2.4312: Improve lubrication practices $1,892 $2,250 $1,892
26,964
kWh
- -
03 2.3191: Use demand controller or load shedder $2,901 $4,000 $2,901
-
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $679 $50 $679
9,672
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $226 $20 $226
3,224
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $165 $450 $165
2,345
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $108 $30 - $108
-
MMBtu
-
08 2.7111: Reduce illumination to minimum necessary levels $4,299 $3,290 $4,299
61,254
kWh
- -
10 2.1232: Keep boiler tubes clean $249 - - $529
-
MMBtu
$(-280.0)
11 2.1222: Install turbulators $1,274 $1,200 - $1,274
-
MMBtu
-
12 2.1123: Install automatic stack damper $2,255 $2,000 - $2,255
-
MMBtu
-
13 2.1131: Repair faulty insulation in furnaces, boilers, etc $847 $250 - $847
-
MMBtu
-
14 2.2122: Install / repair insulation on condensate lines $134 $350 - $134
-
MMBtu
-
15 2.2136: Install / repair insulation on steam lines $4,262 $3,348 - $4,262
-
MMBtu
-
16 2.7221: Lower temperature during the winter season and vice-versa $299 - - $299
-
MMBtu
-
17 2.7447: Install vinyl strip / high speed / air curtain doors $1,440 $159 - $1,440
-
MMBtu
-
18 2.7211: Clean and maintain refrigerant condensers and towers $352 - $432
6,155
kWh
- $(-80.0)
TOTAL RECOMMENDED $26,352 $17,397 $11,067
116,355
kWh
$15,645
-
MMBtu
$(-360.0)
TOTAL IMPLEMENTED $9,016 $3,330 $2,962
42,205
kWh
$6,414
-
MMBtu
$(-360.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs