Assessment Year | 1984 |
---|---|
Principal Product | PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 360,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $218,902 | 4,164,127 |
kWh
|
$0.053 |
Natural Gas | $46,420 | 10,132 |
MMBtu
|
$4.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,207 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $273 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,927 | $4,258 |
$3,927
74,736
kWh
|
- | |
02 | 2.7261: Install timers and/or thermostats | $6,149 | $577 |
$2,957
56,272
kWh
|
$3,192
-
MMBtu
|
|
03 | 2.7226: Use computer programs to optimize hvac performance | $9,259 | $697 |
$2,018
38,394
kWh
|
$7,241
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,737 | $8,500 |
$13,737
261,430
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,911 | $4,000 |
$2,911
55,393
kWh
|
- | |
06 | 2.2694: Use highest temperature for chilling or cold storage | $2,864 | $1,500 |
$2,864
54,513
kWh
|
- | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $755 | $900 |
$755
14,361
kWh
|
- | |
08 | 2.7226: Use computer programs to optimize hvac performance | $1,879 | $20 |
$1,879
35,756
kWh
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,757 | $3,000 | - |
$2,757
-
MMBtu
|
|
10 | 2.2122: Install / repair insulation on condensate lines | $1,942 | $3,384 | - |
$1,942
-
MMBtu
|
|
11 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $192 | $194 | - |
$192
-
MMBtu
|
|
12 | 2.6218: Turn off equipment when not in use | $701 | $650 | - |
$701
-
MMBtu
|
|
13 | 2.3191: Use demand controller or load shedder | $7,135 | $6,000 |
$7,135
-
kWh
|
- | |
14 | 2.4312: Improve lubrication practices | $5,575 | $5,000 |
$5,575
106,096
kWh
|
- | |
15 | 2.2441: Preheat boiler makeup water with waste process heat | $1,443 | $500 | - |
$1,443
-
MMBtu
|
|
16 | 2.4231: Reduce the pressure of compressed air to the minimum required | $246 | $15 |
$246
4,689
kWh
|
- | |
17 | 2.4221: Install compressor air intakes in coolest locations | $462 | $910 |
$462
8,792
kWh
|
- | |
18 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $108 | $30 |
$108
2,052
kWh
|
- | |
19 | 2.7444: Close holes and openings in building such as broken windows | $165 | $90 | - |
$165
-
MMBtu
|
|
TOTAL RECOMMENDED | $62,207 | $40,225 |
$44,574
712,484
kWh
|
$17,633
-
MMBtu
|
||
TOTAL IMPLEMENTED | $273 | $120 |
$108
2,052
kWh
|
$165
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs