| Assessment Year | 1984 |
|---|---|
| Principal Product | REBUILT TURBINE PARTS |
| NAICS |
n/a
|
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 118 |
| Plant Area |
n/a
|
| Annual Production | 600,000
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $212,143 | 2,786,929 |
kWh
|
$0.076 |
| Natural Gas | $35,022 | 7,432 |
MMBtu
|
$4.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $60,577 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $53,294 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,390 | $10,201 |
$14,390
189,039
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $870 | $1,810 |
$870
11,430
kWh
|
- | |
| 03 | 2.3191: Use demand controller or load shedder | $10,922 | $7,500 |
$10,922
-
kWh
|
- | |
| 04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $3,981 | $10,000 | - |
$3,981
-
MMBtu
|
|
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $5,567 | $1,589 |
$1,361
17,878
kWh
|
$4,206
-
MMBtu
|
|
| 06 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $4,813 | $2,800 |
$4,328
56,858
kWh
|
$485
-
MMBtu
|
|
| 07 | 2.4312: Improve lubrication practices | $3,302 | $1,950 |
$3,302
43,376
kWh
|
- | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,626 | - | - |
$2,626
-
MMBtu
|
|
| 09 | 2.1123: Install automatic stack damper | $1,231 | $3,300 | - |
$1,231
-
MMBtu
|
|
| 10 | 2.2437: Recover waste heat from equipment | $3,584 | $2,900 | - |
$3,584
-
MMBtu
|
|
| 11 | 2.4221: Install compressor air intakes in coolest locations | $1,316 | $450 |
$1,316
17,292
kWh
|
- | |
| 12 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,130 | $113 |
$4,130
54,220
kWh
|
- | |
| 13 | 2.7221: Lower temperature during the winter season and vice-versa | $1,562 | - |
$1,562
20,516
kWh
|
- | |
| 14 | 2.2511: Insulate bare equipment | $669 | $400 |
$669
8,792
kWh
|
- | |
| 15 | 2.2511: Insulate bare equipment | $626 | $450 | - |
$626
-
MMBtu
|
|
| 16 | 2.6121: Reduce hot water temperature to the minimum required | $378 | - |
$66
4,103
kWh
|
$312
-
MMBtu
|
|
| 17 | 2.7447: Install vinyl strip / high speed / air curtain doors | $365 | $144 |
$5
293
kWh
|
$360
-
MMBtu
|
|
| 18 | 2.6124: Establish equipment maintenance schedule | $245 | $250 |
$245
3,224
kWh
|
- | |
| TOTAL RECOMMENDED | $60,577 | $43,857 |
$43,166
427,021
kWh
|
$17,411
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $53,294 | $31,907 |
$39,864
383,645
kWh
|
$13,430
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs