ITAC Assessment: KU0133
ITAC logo
ITAC Assessment: KU0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product REBUILT TURBINE PARTS
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,143 2,786,929
kWh
Natural Gas $35,022 7,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,390 $10,201 $14,390
189,039
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $870 $1,810 $870
11,430
kWh
-
03 2.3191: Use demand controller or load shedder $10,922 $7,500 $10,922
-
kWh
-
04 2.2444: Use hot process fluids to preheat incoming process fluids $3,981 $10,000 - $3,981
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $5,567 $1,589 $1,361
17,878
kWh
$4,206
-
MMBtu
06 2.2532: Use only amount of air necessary to prevent explosion hazard $4,813 $2,800 $4,328
56,858
kWh
$485
-
MMBtu
07 2.4312: Improve lubrication practices $3,302 $1,950 $3,302
43,376
kWh
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $2,626 - - $2,626
-
MMBtu
09 2.1123: Install automatic stack damper $1,231 $3,300 - $1,231
-
MMBtu
10 2.2437: Recover waste heat from equipment $3,584 $2,900 - $3,584
-
MMBtu
11 2.4221: Install compressor air intakes in coolest locations $1,316 $450 $1,316
17,292
kWh
-
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,130 $113 $4,130
54,220
kWh
-
13 2.7221: Lower temperature during the winter season and vice-versa $1,562 - $1,562
20,516
kWh
-
14 2.2511: Insulate bare equipment $669 $400 $669
8,792
kWh
-
15 2.2511: Insulate bare equipment $626 $450 - $626
-
MMBtu
16 2.6121: Reduce hot water temperature to the minimum required $378 - $66
4,103
kWh
$312
-
MMBtu
17 2.7447: Install vinyl strip / high speed / air curtain doors $365 $144 $5
293
kWh
$360
-
MMBtu
18 2.6124: Establish equipment maintenance schedule $245 $250 $245
3,224
kWh
-
TOTAL RECOMMENDED $60,577 $43,857 $43,166
427,021
kWh
$17,411
-
MMBtu
TOTAL IMPLEMENTED $53,294 $31,907 $39,864
383,645
kWh
$13,430
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs