Assessment Year | 1984 |
---|---|
Principal Product | APPARREL |
NAICS |
n/a
|
SIC | 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 132,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $9,351 | 96,131 |
kWh
|
$0.097 |
Natural Gas | $7,593 | 1,358 |
MMBtu
|
$5.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,065 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $598 | $1,200 | - |
$598
-
MMBtu
|
- | |
02 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,038 | - |
$1,144
11,723
kWh
|
$(-106.0)
-
MMBtu
|
- | |
03 | 2.6232: Install set-back timers | $3,890 | $945 |
$3,890
39,859
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $219 | - | - |
$419
-
MMBtu
|
$(-200.0) | |
05 | 2.1222: Install turbulators | $162 | $441 | - |
$162
-
MMBtu
|
- | |
06 | 2.7261: Install timers and/or thermostats | $369 | - | - |
$369
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $200 | $216 |
$200
2,052
kWh
|
- | - | |
08 | 2.2136: Install / repair insulation on steam lines | $184 | $140 | - |
$184
-
MMBtu
|
- | |
09 | 2.2135: Repair and eliminate steam leaks | $196 | $150 | - |
$196
-
MMBtu
|
- | |
10 | 2.2122: Install / repair insulation on condensate lines | $58 | $220 | - |
$58
-
MMBtu
|
- | |
11 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $59 | $40 | - |
$59
-
MMBtu
|
- | |
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $106 | $165 | - |
$106
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $7,079 | $3,517 |
$5,234
53,634
kWh
|
$2,045
-
MMBtu
|
$(-200.0) | ||
TOTAL IMPLEMENTED | $2,065 | $330 |
$1,144
11,723
kWh
|
$1,121
-
MMBtu
|
$(-200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs