| Assessment Year | 1984 |
|---|---|
| Principal Product | LEATHER & CANVAS GOODS |
| NAICS |
n/a
|
| SIC | 3199: Leather Goods, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
n/a
|
| Annual Production | 60,000,000
pieces
|
| Production Hrs. Annual | 8,580
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $29,763 | 465,123 |
kWh
|
$0.064 |
| Natural Gas | $13,937 | 3,224 |
MMBtu
|
$4.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,992 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $3,948 | - | - |
$3,948
-
MMBtu
|
- | |
| 02 | 2.7229: Air condition only space necessary | $2,056 | - | - |
$2,056
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $267 | - | - |
$467
-
MMBtu
|
$(-200.0) | |
| 04 | 2.1222: Install turbulators | $307 | $659 | - |
$307
-
MMBtu
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,112 | $5,027 |
$125
2,052
kWh
|
$4,987
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,145 | $6,502 |
$6,145
95,838
kWh
|
- | - | |
| 07 | 2.3191: Use demand controller or load shedder | $397 | - |
$397
-
kWh
|
- | - | |
| 08 | 2.2136: Install / repair insulation on steam lines | $212 | $264 | - |
$212
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $18,444 | $12,452 |
$6,667
97,890
kWh
|
$11,977
-
MMBtu
|
$(-200.0) | ||
| TOTAL IMPLEMENTED | $11,992 | $5,291 |
$522
2,052
kWh
|
$11,670
-
MMBtu
|
$(-200.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs