ITAC Assessment: KU0125
ITAC logo
ITAC Assessment: KU0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product LEATHER & CANVAS GOODS
NAICS
n/a
SIC 3199: Leather Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 60,000,000
pieces
Production Hrs. Annual 8,580
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,763 465,123
kWh
Natural Gas $13,937 3,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $3,948 - - $3,948
-
MMBtu
-
02 2.7229: Air condition only space necessary $2,056 - - $2,056
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $267 - - $467
-
MMBtu
$(-200.0)
04 2.1222: Install turbulators $307 $659 - $307
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $5,112 $5,027 $125
2,052
kWh
$4,987
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,145 $6,502 $6,145
95,838
kWh
- -
07 2.3191: Use demand controller or load shedder $397 - $397
-
kWh
- -
08 2.2136: Install / repair insulation on steam lines $212 $264 - $212
-
MMBtu
-
TOTAL RECOMMENDED $18,444 $12,452 $6,667
97,890
kWh
$11,977
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $11,992 $5,291 $522
2,052
kWh
$11,670
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs