Assessment Year | 1984 |
---|---|
Principal Product | QUILTING MATERIAL |
NAICS |
n/a
|
SIC | 2395: Pleating, Decorative and Novelty Stitching, and Tucking for the Trade |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 22,500
thousand feet
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $55,720 | 772,567 |
kWh
|
$0.072 |
Natural Gas | $48,513 | 9,646 |
MMBtu
|
$5.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,543 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,804 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.5122: Replace high resistance ducts, pipes, and fittings | $9,129 | $5,400 | - |
$9,129
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,060 | $5,000 | - |
$5,060
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,649 | $3,690 |
$4,649
64,478
kWh
|
- | |
04 | 2.7261: Install timers and/or thermostats | $3,254 | $450 |
$3,254
45,135
kWh
|
- | |
05 | 2.1232: Keep boiler tubes clean | $1,926 | $2,000 | - |
$1,926
-
MMBtu
|
|
06 | 2.1222: Install turbulators | $1,610 | $2,120 | - |
$1,610
-
MMBtu
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,439 | $1,985 | - |
$1,439
-
MMBtu
|
|
08 | 2.6121: Reduce hot water temperature to the minimum required | $423 | - |
$423
5,862
kWh
|
- | |
09 | 2.6232: Install set-back timers | $401 | $50 |
$401
5,569
kWh
|
- | |
10 | 2.7492: Use proper thickness of insulation on building envelope | $272 | $280 | - |
$272
-
MMBtu
|
|
11 | 2.7261: Install timers and/or thermostats | $211 | $300 |
$211
2,931
kWh
|
- | |
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $169 | - |
$169
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $28,543 | $21,275 |
$9,107
126,320
kWh
|
$19,436
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,804 | $13,755 |
$9,107
126,320
kWh
|
$8,697
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs