Assessment Year | 1984 |
---|---|
Principal Product | MOUNTED CRANES |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 2,500
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,009 | 1,541,618 |
kWh
|
$0.056 |
Natural Gas | $39,611 | 7,582 |
MMBtu
|
$5.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,920 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,079 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $18,588 | $1,074 | - |
$18,588
-
MMBtu
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,459 | - |
$463
8,206
kWh
|
$2,996
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,757 | $12,786 |
$7,757
137,456
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $795 | $200 | - |
$1,195
-
MMBtu
|
$(-400.0) | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $398 | $400 | - |
$548
-
MMBtu
|
$(-150.0) | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,012 | $2,800 |
$5,012
88,804
kWh
|
- | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,000 | $360 |
$1,000
17,878
kWh
|
- | - | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $286 | - | - |
$286
-
MMBtu
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $625 | $300 |
$625
11,137
kWh
|
- | - | |
TOTAL RECOMMENDED | $37,920 | $17,920 |
$14,857
263,481
kWh
|
$23,613
-
MMBtu
|
$(-550.0) | ||
TOTAL IMPLEMENTED | $25,079 | $4,474 |
$5,012
88,804
kWh
|
$20,617
-
MMBtu
|
$(-550.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs