| Assessment Year | 1983 |
|---|---|
| Principal Product | STEEL FASTENERS |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 2,200,000
lb
|
| Production Hrs. Annual | 2,385
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $24,549 | 355,510 |
kWh
|
$0.069 |
| Natural Gas | $13,105 | 2,423 |
MMBtu
|
$5.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,083 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,125 | $300 | - |
$1,125
-
MMBtu
|
|
| 02 | 2.1123: Install automatic stack damper | $1,012 | $800 | - |
$1,012
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,606 | $4,200 |
$2,606
37,808
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $465 | $3,000 | - |
$465
-
MMBtu
|
|
| 05 | 2.6214: Shut off pilots in standby equipment | $200 | - | - |
$200
-
MMBtu
|
|
| 06 | 2.7261: Install timers and/or thermostats | $445 | $200 |
$445
6,448
kWh
|
- | |
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $162 | - | - |
$162
-
MMBtu
|
|
| 08 | 2.7243: Improve air circulation with destratification fans / other methods | $162 | - |
$162
2,345
kWh
|
- | |
| TOTAL RECOMMENDED | $6,177 | $8,500 |
$3,213
46,601
kWh
|
$2,964
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,083 | $8,000 |
$2,606
37,808
kWh
|
$1,477
-
MMBtu
|
||