ITAC Assessment: UM0099
ITAC logo
ITAC Assessment: UM0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive Fuel System Valves
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 125,000
ft2
Annual Production 25,250,000
pieces
Production Hrs. Annual 4,472
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,985 2,398,300
kWh
Electricity Demand $108,846 6,900
kW-mo/yr
Electricity Fees $(-664.0) -
Natural Gas $61,498 13,238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,644 $12,823 $4,644
96,424
kWh
- - -
02 2.7135: Install occupancy sensors $194 $200 $194
6,448
kWh
- - -
03 3.4114: Replace city water with recycled water via cooling tower $5,407 $4,500 - $5,407
-
Tgal
- -
04 3.3125: Use distillation, evaporation to remove contaminants $3,527 $6,000 - - $3,527
-
gal
-
05 4.652: Replace existing equipment with more suitable substitutes $31,291 - - - - $31,291
TOTAL RECOMMENDED $45,063 $23,523 $4,838
102,872
kWh
$5,407
-
Tgal
$3,527
-
gal
$31,291
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs