ITAC Assessment: KU0106
ITAC logo
ITAC Assessment: KU0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product AUTO PARTS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 9,000,000
pieces
Production Hrs. Annual 5,640
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,735 2,072,392
kWh
Natural Gas $33,406 6,641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $487 $150 $487
10,551
kWh
-
02 2.6124: Establish equipment maintenance schedule $636 $375 $636
13,775
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,124 - $1,124
24,326
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,926 $1,260 - $1,926
-
MMBtu
05 2.1123: Install automatic stack damper $2,414 $4,100 - $2,414
-
MMBtu
06 2.2515: Use optimum thickness insulation $498 $100 - $498
-
MMBtu
07 2.2437: Recover waste heat from equipment $1,846 $1,000 $1,846
107,562
kWh
-
08 2.7441: Replace broken windows and/or window sash $342 $80 - $342
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $13,291 $7,951 $13,291
287,808
kWh
-
10 2.7261: Install timers and/or thermostats $12,782 $10 $203
4,396
kWh
$12,579
-
MMBtu
11 2.7314: Reduce ventilation air $1,554 - - $1,554
-
MMBtu
TOTAL RECOMMENDED $36,900 $15,026 $17,587
448,418
kWh
$19,313
-
MMBtu
TOTAL IMPLEMENTED $840 $180 - $840
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs