ITAC Assessment: NV0138
ITAC logo
ITAC Assessment: NV0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Sheet Metal Fabrication
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 22,500
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 6,344
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,908 465,416
kWh
Electricity Demand $9,883 1,065
kW-mo/yr
Electricity Fees $1,952 -
Natural Gas $5,716 966
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $255 $450 $157
3,810
kWh
$93
-
kW-mo/yr
$5 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,007 $400 $1,842
44,256
kWh
$1,106
-
kW-mo/yr
$59 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $932 $2,270 $643
15,533
kWh
$271
-
kW-mo/yr
$18 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,227 $6,280 $2,917
70,047
kWh
$1,227
-
kW-mo/yr
$83 -
05 2.7243: Improve air circulation with destratification fans / other methods $708 $1,391 $(-115.0)
(-2,638)
kWh
$(-102.0)
-
kW-mo/yr
$(-1.0) $926
-
MMBtu
TOTAL RECOMMENDED $9,129 $10,791 $5,444
131,008
kWh
$2,595
-
kW-mo/yr
$164 $926
-
MMBtu
TOTAL IMPLEMENTED $3,970 $2,241 $1,884
45,428
kWh
$1,097
-
kW-mo/yr
$63 $926
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs