ITAC Assessment: MA0649
ITAC logo
ITAC Assessment: MA0649
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Cosmetic packaging containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 171
Plant Area 117,180
ft2
Annual Production 45,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $456,840 4,356,897
kWh
Electricity Demand $76,486 10,990
kW-mo/yr
Electricity Fees $5,510 -
LPG $5,065 211
MMBtu
Fuel Oil #2 $16,145 927
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4226: Use / purchase optimum sized compressor $20,752 $85,000 $18,406
175,459
kWh
$2,346
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,617 $63,000 $12,961
123,552
kWh
$1,656
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $5,212 $10,500 $5,212
49,683
kWh
-
04 2.7135: Install occupancy sensors $2,945 $3,000 $2,945
28,080
kWh
-
TOTAL RECOMMENDED $43,526 $161,500 $39,524
376,774
kWh
$4,002
-
kW-mo/yr
TOTAL IMPLEMENTED $2,945 $3,000 $2,945
28,080