ITAC Assessment: KU0105
ITAC logo
ITAC Assessment: KU0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product COMMERCIAL REFRIGERATORS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $1
M
to 5
M
# of Employees 200
Plant Area
n/a
Annual Production 7,000
pieces
Production Hrs. Annual 4,233
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,069 1,478,019
kWh
Natural Gas $83,992 16,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,827

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,036 $200 $4,036
55,393
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $28,910 $41,000 $28,910
391,852
kWh
-
03 2.7261: Install timers and/or thermostats $10,333 $3,000 - $10,333
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $4,827 $2,400 - $4,827
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $1,951 - - $1,951
-
MMBtu
06 2.1221: Replace obsolete burners with more efficient ones $28,238 $35,000 - $28,238
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $529 $1,000 - $529
-
MMBtu
TOTAL RECOMMENDED $78,824 $82,600 $32,946
447,245
kWh
$45,878
-
MMBtu
TOTAL IMPLEMENTED $4,827 $2,400 - $4,827
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs